Mekong River Commission: Draft (P)DG2018 available for comment
In an effort by the MRCS CEO to ensure meaningful broader stakeholder engagement in the review and updating process of the Preliminary Design Guidance for Proposed Mainstream Dams in the Lower Mekong Basin (PDG2009), the third draft (P)DG2018 is now available for comment during 27 June – 18 July 2018.
Click here for more details.